Spinnaker Slack



San Francisco Bay Sunday April 25 2021 13:59 PDT NOAA Forecast

Register for Summit Gardening Days, part of the 2020 Spinnaker Summit, to join our hackathon and earn rewards for your Spinnaker contributions October 19 - November 12. Spinnaker Slack: Join our Slack to participate.Have questions? Ask them in #gardening-general, our main event channel.; Spinnaker Summit schedule: View the global schedule for Spinnaker Summit and Summit. BOAT SALES Call the Spinnaker Sailing Office at 415-543-7333 for a Demo Sail. Pier 40, South Beach Harbor.

Diodes' 8V to 29V Complementary MOSFETs are designed to minimize the on-state resistance (RDS (on)) and yet maintain superior switching performance. The complementary MOSFET pairs ensure high efficiency and simplicity of design. They are available in space-saving packages for cost optimized solutions such as SO8, PQFN3x3, and TSOP-6 package. Target applications include DC-DC conversion, motor control, battery management, and onboard chargers. Complementary fet

Terri cheney

6 hours 12 minutes ago
REST OF TODAY..SW winds 5 to 15 kt. Showers likely and a slight chance of thunderstorms.
TONIGHT..W winds 5 to 15 kt.
MON..W winds 10 to 20 kt with gusts up to 25 kt.
MON NIGHT..W winds 5 to 15 kt with gusts up to 25 kt.
TUE..SW winds 10 to 20 kt with gusts up to 25 kt.
TUE NIGHT..SW winds 5 to 15 kt.
WED..SW winds 5 to 15 kt.
THU..SW winds up to 10 kt. Winds and wind waves higher in and near thunderstorms.

The following article describes a safe and fast way of gybing (jibing) a spinnaker on a 40 foot yacht. The key aim has been to reduce complexity so that no one in the crew is trying to do several things at once. E.g. it’s quite a common technique, where the spinnaker trimmer tries to trim both sheets at the same time during the gybe, which on this size of boat becomes nearly impossible in a good breeze.

Spinnaker Slack Notifications

Spinnaker
  • Dinghy sailing with a spinnaker is so much fun. Here, we go back to basics with a quick guide to asymmetric spinnaker flying.
  • Quite the same Wikipedia.

The method requires that you prepare by making a mark on each of the spinnaker sheets for a base trimming position where the spinnaker clews only just clears the forestay when sailing without a pole.

To break down the activities it’s easier to look at the gybing maneuver as a three phase operation:

  1. Preparing for Gybe (Jibe)
  2. Gybing
  3. Post-Gybe

Phase 1: Preparing for Gybe

  • Tactician: calls “Set up for a gybe!
  • Mast: Raises the pole on the mast to the dip mark. Calls “Pole ready!
  • Pit: Prepares the new sheet on the winch and throws it forward so that the spinn-trimmer can reach it later
  • Main: Centers the Vang and starts bringing on the main sheet. Calls: “Main ready!

Everyone else just keeps doing what they’re doing, in particular Spinn-trimmer concentrates on trimming the kite, and the helmsman sails to optimal wind angle.

Spinnaker

Phase 2: Gybing

  • Tactician: once decided the timing is optimal calls: “Gybe the boat
  • Helmsman: starts turning the boat around
  • Spinn-trimmer: eases the active sheet in order to keep the spinnaker perfectly trimmed while the boat is turning
  • Brace-trimmer: brings the pole back
  • Pit: eases the pole kicker (downhaul) to allow for the pole to come back
  • Spinn-Grinder: Locks off the active sheet once the mark is visible at the winch (see picture)
  • Spinn trimmer: Grabs the new active sheet and takes out any slack
  • Spinn Grinder: Moves across to the new winch and puts the handle in
  • Main trimmer: brings on the sheet quickly (or watches for the perfect timing to throw the boom across if the wind isn’t to heavy)
  • Tactician: Once the boat is going dead downwind calls “TRIP!
  • Mast: pulls the trip line on the pole
  • Pit: Eases the topping lift, i.e. dips the pole
  • Bow: Takes hold of pole and guides it across
  • Main trimmer: Throws boom across, i.e. gybes the main.
  • Brace trimmer: Takes the old active brace off the winch (after first checking that the spinn trimmer has the new sheet in his hand)

Phase 3 – post gybe

Spinnaker Slack Bot

The boat is now sailing on the new course with the main gybed, and the kite flying beautifully but still hasn’t got a pole set.

  • Brace trimmer: moves across to windward and prepares the new brace on the winch (although not bringing it on)
  • Bow: attaches the new brace to the end of the pole and calls “made!
  • Brace trimmer: (Rapidly) brings on the new brace
  • Pit: Brings on the topping lift
  • Pit: in a slow controlled way eases the old sheet, which was locked off at the mark, allowing for the brace to gradually take over the load from the old sheet. There is some communication needed between Pit and Brace trimmer to make this happen.

Spinnaker Slack

Spinnaker slack

That’s it, all done!

Spinnaker

Spinnaker Slacks

See also this youtube clip provided by Forespar which explains spinnaker gybing with a pole on slightly smaller boats (30-35 foot)

Enable Slack Spinnaker

Article Rating